Several facts about time

Availability answers whether a person can work during a proposed period. Conditional responses and alternatives can inform planning without becoming a commitment. Staffing turns that evidence into intended work through its own lifecycle.

Assignments describe the job and a broad work period. A Production Day describes an operational day. Schedule describes the sequence and timing of planned work. Call Sheet describes an issued projection of that plan. These facts are connected, but they cannot safely be collapsed into one calendar event.

Publication is versioned

An issued call sheet needs to identify the content and context the recipient actually received. Revising the plan creates a new publication question rather than changing the meaning of an old acknowledgement. Review of a draft and publication of the issued version remain distinct actions.

Queueing a delivery does not prove that a provider delivered it. Delivery does not prove that a person viewed it. Viewing does not prove acknowledgement, and acknowledgement does not prove arrival. A useful operational system needs these distinctions even when the interface keeps the presentation compact.

Presence records actuality

Presence describes operational participation. Called, acknowledged, checked in, late, absent, wrapped and replaced are conceptual distinctions used here to explain the domain. This list is not a published internal enum or complete transition table.

An ordinary meeting or hold should not automatically create an operational production day. Conversely, a day can relate multiple assignments, schedule items and recipients rather than being reduced to one person’s calendar entry.

Calendar semantics

Date-only work periods and time-zone-aware instants have different meaning. A calendar day should not shift because a viewer is in another timezone. Scheduled instants should retain their intended context. Display conventions belong at the human-facing boundary.

The model introduces more records and publication state than a simple calendar. It supports the practical question the production needs answered: what was planned, what was issued, who acknowledged it, and what actually happened?

Time and operationsAvailability informs staffing. Assignments describe work. Production Days coordinate plans, publication and actual presence.Person participates through Production MembershipProduction Membership belongs to ProductionProduction includes participation Production MembershipProduction Membership identifies PersonProduction Membership performs work through Production AssignmentProduction Assignment retains participation Production MembershipProduction Assignment is called for work on Production DayProduction owns operational Production DayProduction Day plans work through ScheduleSchedule is frozen into Call SheetProduction Day publishes Call SheetCall Sheet targets eligible recipients through AudienceCall Sheet receives version-specific AcknowledgementAcknowledgement is distinct from recorded PresenceProduction Day records PresencePerson responds with AvailabilityAvailability informs StaffingStaffing leads to participation through Production MembershipPersonThe person behind every jobAvailabilityWhether someone can work those datesStaffingFrom candidate to booked crewProductionThe film or project everyone works onMembershipWho belongs to this productionAssignmentWho does which job, and whenDayOne day of production workScheduleWhat happens whenCall SheetThe issued plan sent to the crewAudienceWho an update is intended forAcknowledgementConfirmation of a specific call sheetPresenceWho has arrived or wrapped
Connections in words
  • Person participates through Production Membership
  • Production Membership belongs to Production
  • Production includes participation Production Membership
  • Production Membership identifies Person
  • Production Membership performs work through Production Assignment
  • Production Assignment retains participation Production Membership
  • Production Assignment is called for work on Production Day
  • Production owns operational Production Day
  • Production Day plans work through Schedule
  • Schedule is frozen into Call Sheet
  • Production Day publishes Call Sheet
  • Call Sheet targets eligible recipients through Audience
  • Call Sheet receives version-specific Acknowledgement
  • Acknowledgement is distinct from recorded Presence
  • Production Day records Presence
  • Person responds with Availability
  • Availability informs Staffing
  • Staffing leads to participation through Production Membership

Availability

  • Available
  • Unavailable
  • Conditional
  • Alternative dates

Presence

  • Checked in
  • Late
  • Absent
  • Wrapped
  • Replaced